How do I add labour cost?

Step-by-step guide on adding labour cost to your estimate using fixed labour costs or production-based labour rates calculated directly from takeoffs.

T
Written by TakeCost
Updated over a month ago

You can add labour in two ways:

Option 1: Fixed labour cost

  • Add a labour line item

  • Enter the unit cost directly

Option 2: Production-based labour (recommended)

  • Apply a production rate (e.g. sq ft per hour)

  • TakeCost calculates time and labour cost automatically based on your takeoff

This lets you see real time and cost tied to actual output.